Basingstoke College of Technology

the college awarded Basingstoke Energy Services Co-op a contract to install the town's largest solar PV system.

The 100 kW 400 panel system will be at the forefront of the College's drive to become one of the most sustainable colleges in the UK. All the energy generated will be used on-site to power college operations. The college expects the new system will substantially reduce its electricity bills; lower its carbon footprint and fully pay for itself within seven years.